Correlation Analysis Between Material Thickness and Welding Length on The Completion Time of Vessel Product in The Static Mixer Project

Penulis

  • Salsabila Bahri Institut Teknologi Batam
  • Nahrul Hayati Institut Teknologi Batam

DOI:

https://doi.org/10.62375/jsintak.v4i2.801

Kata Kunci:

Correlation, Material Thickness, Welding Length, Completion Time

Abstrak

This study aims to analyze the relationship between fabrication technical parameters (material thickness and welding length) and the completion time of static mixer vessel products. The research sample consisted of 30 product units, with data collected retrospectively from the project documentation of PT. NOV Profab for the period December 2024 until July 2025. The method used was quantitative correlational. The Shapiro-Wilk normality test indicated that the data was not normally distributed (p < 0.05), therefore correlation analysis was performed using the non parametric Spearman’s Rank test. The results show that the relationship between material thickness and completion time is very weak and not significant (r = 0.126 and p = 0.507). Similarly, the relationship between welding length and completion time is weak and not significant (r = 0.301 and p = 0.106). In conclusion, material thickness and welding length are not proven to have a statistically significant relationship with the completion duration of static mixer products. This finding implies that project time estimation requires consideration of factors other that these technical parameters.

Referensi

Z. Zhu, V. Dhokia, and S. T. Newman, “A new algorithm for build time estimation for fused filament fabrication technologies,” Journal of Engineering Manufacture, vol. 230, no. 12, pp. 2214–2228, 2016, doi: 10.1177/0954405416640661.

Suproyo, B. Arianto, and Indramawan, “Perancangan Jadwal Fabrikasi Pressure Vessel yang Optimal dengan Metode C.P.M.,” Jurnal Teknik Industri, vol. 6, no. 1, pp. 23–36, 2017, [Online]. Available: https://journal.universitassuryadarma.ac.id/index.php/jtin/

article/view/217

J. R. Díaz-Reza, J. R. Mendoza-Fong, J. Blanco-Fernández, J. A. Marmolejo-Saucedo, and J. L. García-Alcaraz, “The role of advanced manufacturing technologies in production process performance: A causal model,” Applied Sciences (Switzerland), vol. 9, no. 18, Sep. 2019, doi: 10.3390/app9183741.

R. Dwi Oktavia and N. Hayati, “Analysis of Fabrication Work Progress Based on Time Duration and Component Weight at PT. DIP Engineering,” Jurnal Sintak, vol. 4, no. 1, 2025, doi: 10.62375/jsintak.v4i1.719.

F. Auwalia, N. Hayati, and I. Teknologi Batam, “Correlation Analysis Between Manhour And Manpower In The Aircraft Structure Repair Division At Batam Aero Technic Hangar,” Jurnal Sintak, vol. 4, no. 1, 2025, doi: 10.62375/jsintak.v4i1.585.

J. Heizer, B. Render, C. L. Munson, and P. Griffin, Operations management: Sustainability and supply chain management20, 14th ed. Pearson, 2022.

R. Kumar, Research methodology: A step-by-step guide for beginners. SAGE Publication Ltd, 2018.

Ahmadin, “Social research methods: Qualitative and quantitative approaches,” Jurnal Kajian Sosial Dan Budaya: Tebar Science, vol. 6, pp. 104–113, Apr. 2022, [Online]. Available: https://ejournal.tebarscience.com/index.php/JKSB/article/view/103

W. Daniel and C. Cross, Biostatistics: A Foundation for Analysis in the Health Sciences. John Wiley & Sons., 2018.

S. le Cessie, J. J. Goeman, and O. M. Dekkers, “Who is afraid of non-normal data? Choosing between parametric and non-parametric tests,” Feb. 01, 2020, NLM (Medline). doi: 10.1530/EJE-19-0922.

H. Hernandez, “Testing for Normality: What is the Best Method?,” ForsChem Research Reports, vol. 6, pp. 1–38, May 2021, doi: 10.13140/RG.2.2.13926.14406.

P. Mishra, C. M. Pandey, U. Singh, A. Gupta, C. Sahu, and A. Keshri, “Descriptive statistics and normality tests for statistical data,” Ann. Card. Anaesth., vol. 22, no. 1, pp. 67–72, Jan. 2019, doi: 10.4103/aca.ACA_157_18.

P. Schober and L. A. Schwarte, “Correlation coefficients: Appropriate use and interpretation,” Anesth. Analg., vol. 126, no. 5, pp. 1763–1768, May 2018, doi: 10.1213/ANE.0000000000002864.

H. Akoglu, “User’s guide to correlation coefficients,” Turk. J. Emerg. Med., vol. 18, no. 3, pp. 91–93, Sep. 2018, doi: 10.1016/j.tjem.2018.08.001.

R. Gusrita and N. Hayati, “The Correlation Analysis between the Number of CIF and the Number of Account at Bank Syariah Indonesia KCP Batam Raden Patah,” Jurnal Sintak, vol. 3, no. 1, 2024.

Diterbitkan

2026-03-25

Cara Mengutip

Bahri, S., & Hayati, N. (2026). Correlation Analysis Between Material Thickness and Welding Length on The Completion Time of Vessel Product in The Static Mixer Project. JURNAL SINTAK, 4(2), 82–90. https://doi.org/10.62375/jsintak.v4i2.801

Terbitan

Bagian

Articles