EVALUASI KINERJA CNC TURNING MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSESS PADA BENGKEL XYZ. (2025). JURNAL LOGISTICA, 3(2), 56-64. https://doi.org/10.62375/logistics.v3i2.592