[1]
“Analysis of Fabrication Work Progress Based on Time Duration and Component Weight at PT. DIP Engineering”, JSINTAK, vol. 4, no. 1, pp. 20–30, Sep. 2025, doi: 10.62375/jsintak.v4i1.719.